| Brand | Qiongkai |
| Model Tag. | TCT - |
| Type | Cable tray |
| Product Name | Through cable tray |
| Material | Steel / Stainless steel / Alloy / FRP |
| Origin | Shanghai, China |
| Perfortable Design | Customizable |
| Surface Treatment | Galvanized / HDG / Powder coated |
| Finish | Raw / HDG / Powder coated |
| Color | Silver / Black / Green / Powder coated design |
| Side Rail Height | 25-600mm |
| Width | 50-1000mm |
| Length | 1-10m |
| Thickness | 0.5-2.0mm |
| Certificates | ISO / CE |
| ODM | √ |
| OEM | √ |
| MOQ | 50 |
| Insurance | Customizable |
| Loading Port | Shanghai / Tianjin |
| Selling Units | Meters |
| Max. Working Load | According to Size |
| Production Capacity | 10000-40000 meters depend on product |
| Price Terms | EXW, FOB, CIF, CFR |
| Delivery Time | 25 Days |
| After-sales | Online technical support |
| Free Sample | √ |
The Powder coated cable tray is mainly based on the characteristics of the fire-resistant coating. Under normal temperature, the coating formed by the fire-resistant coating plays a protective and decorative role on the cable tray. When encountering high-temperature fire, the fire-resistant coating will undergo physical and chemical changes such as expansion and carbonization, forming a thick heat-insulating layer. This heat-insulating layer can effectively block the transfer of heat to the cable tray and cables, slow down the heating rate of the cable tray and cables, reduce the risk of cable damage or combustion due to high temperature, and thus extend the normal working time of the cables during a fire.
The cable trays are available in steel, stainless steel, alloy, and FRP (Fiberglass Reinforced Plastic) substrates depending on the environmental requirements.
Under exposure to high heat, the coating expands and carbonizes to create a thick heat-insulating layer, slowing thermal transfer and prolonging normal cable operation.
Yes, OEM and ODM services are supported. Side rail height (25-600mm), width (50-1000mm), length (1-10m), thickness (0.5-2.0mm), and perforations can all be customized.
The minimum order quantity is 50 meters, and the standard delivery lead time is approximately 25 days shipped via Shanghai or Tianjin ports.
Yes, free samples are provided to help customers verify dimensions, surface finish quality, and coating properties prior to ordering.